How much does it cost to open a trampoline park?
Estimate the all-in cost to open an indoor trampoline park, from the trampoline court and foam pits and the ninja and climbing attractions to the building fit-out, the party rooms and concession, the waiver and ticketing technology, the furniture and seating, the opening inventory and the working-capital cushion. See the total, a realistic range, and what each part adds.
Typical range $1,888,250 – $4,357,500
- Leasehold improvements$1,375,000
- Trampoline court & decking$600,000
- Specialty attractions$150,000
- Party rooms & concession build$120,000
- Waiver, ticketing & POS technology$30,000
- Furniture, lockers & spectator seating$45,000
- Signage & branding$35,000
- Opening inventory$20,000
- Lease deposit & first months$60,000
- Permits, licenses & professional fees$40,000
- Pre-opening staff & training$40,000
- Grand-opening marketing$30,000
- Working-capital buffer$360,000
- Total$2,905,000
Recommended next steps
Some links below are affiliate links. If you buy through them, Calcatrice may earn a commission at no extra cost to you. We only suggest tools that fit your result, and a company can't pay to show up here.
$1.5 million to $3 million all-in is a typical park: a large jump court, a full set of attractions, party rooms, a cafe and a real reserve. Finance the build and run a proper back office from day one.
What this assumes, and where it could be wrong
Every one of these is a place the number could be off. They are here because you should be able to check our working, not because we are hedging.
EVERY NUMBER HERE IS YOURS, BECAUSE THERE IS NO PUBLISHED FIGURE TO LOOK UP.
The jump area is the master input and it moves two lines at once. The trampoline court and decking scale with the active square footage, and the building footprint that court sits inside scales with it too. Set the court size and the attraction mix first, then tune the shell around them, or you will end up pricing a box that does not match the floor you drew.
The building is a tall, wide-open box and the fit-out reflects that. A trampoline park needs height for the walls and the drop attractions, and a large open volume is costly to heat, cool and light. Taking over a former big-box store or an existing park can cut the leasehold line, while a raw shell means new HVAC, sprinklers and power. Get the build rate from contractors who have walked the actual space.
Parties and food are close to a second business. The party rooms and the cafe bring a health permit, kitchen equipment, food handling rules and daily labor that the court alone does not need, and they carry margin that open-jump tickets rarely match on their own. Set that input near zero to see the court-only number, then compare the two.
The court is supervised and it never stops needing maintenance. Trampoline springs, pads and netting wear and get replaced on a rhythm, and a supervised jump floor carries court monitors, a safety program and an insurance premium that a quiet retail unit does not. Keep those recurring costs in the monthly operating figure above, since the reserve is sized from it and they are not part of the one-time opening total.